SunCoke Energy owns and operates five cokemaking plants in the United States, one in Vitoria, Brazil and a joint venture with VISA Steel Limited in Odisha, India.
Our coal logistics and handling terminals located in the Ohio River Valley Basin connect with Norfolk Southern and CSX rail networks for direct access to major East Coast, Gulf Coast, Great Lakes ports and rail transfer points.
Click on the map for details about each site.
We are discussing opportunities for new cokemaking facilities in North America. Contact us to discuss your cokemaking requirements.
SunCoke Energy Headquarters
1011 Warrenville Road
Lisle, Il 60532
Jewell Coke and Coal
Operations
Vansant, Virginia
Coke Operations
Began Operations: 1962
Coke Ovens: 142
Annual Capacity: 720,000 tons
Waste Heat: Limited use for thermal coal drying
Coal Operations
Began Operations: 1952
Annual coal production (excluding H.Keene acquisition): appx. 1,100,000 tons
Indiana Harbor Operations
East Chicago, Indiana
Began Operations: 1998
Coke Ovens: 268
Annual Capacity: 1,220,000 tons
Waste Heat: Heat for power generation
Haverhill Operations
Franklin Furnace, Ohio
Began Operations (Phase I): 2005
Began Operations (Phase II): 2008
Coke Ovens: 200
Annual Capacity: 1,100,000 tons
Waste Heat (Phase I): Process Steam
Waste Heat (Phase II): Power Generation
Granite City Operations
Granite City, Illinois
Began Operations: 2009
Coke Ovens: 120
Annual Capacity: 650,000 tons
Waste Heat: Steam for power generation
Middletown Operations
Middletown, Ohio
Began Operations: 2011
Coke Ovens: 100
Annual Capacity: 550,000 tons
Waste Heat: Power generation
Kentucky Coal Terminal
Cattlesburg, KY
Utilizes an advanced underground blending system with 8 feeders and 2,500-ton/hour loading capacity.
• Big Sandy River location (mile 7.5)
• 6-million-ton throughput capacity
• 250,000-ton storage capacity
• Truck/barge access (truck in; barge out)
• Barge: 6-barge fleeting capacity
Ceredo Coal Terminal
Ceredo, WV
Offers nine stacking tubes with Merrick feeders for maximum blending flexibility. Our 500-ton/hour barge-to-ground offload system and two barge loadouts enable maximum efficiency, including simultaneous ground-to-barge or rail-to-barge loading.
• Ohio River location (mile 314.5)
• 18-million-ton throughput capacity
• 425,000-ton ground storage capacity
• Rail/barge access (rail or barge in; rail or barge out)
• Rail: 1,100-car track capacity
• Barge: 200-barge fleeting capacity
Quincy Coal Terminal
Belle, WV
Located near high-quality, low-cost metallurgical coal production, offering a state-of-the-art truck auger, computerized truck scales and Tenna automatic sampler for outbound blend analysis/quality control.
• Kanawha River location (mile 73)
• 7-million-ton throughput capacity
• 5,000-ton/day barge offload capacity
• 250,000-ton ground storage capacity
• Truck/rail/barge access (truck in; rail or barge out)
• Rail: New 100-car unit train load-out facility for Norfolk Southern
• Barge: 28-barge fleeting capacity
Lake Coal Terminal
East Chicago, IN
Provides coal handling and blending services to SunCoke’s Indiana Harbor cokemaking operations, with additional capacity and capability to serve coal producers marketing to industrial users across the region.
• East Chicago, Indiana location
• Ability to store, crush and blend up to 6 different coals
• 2 million tons handled annually; additional capacity available
• Rail/truck access (rail in; truck out)
- Headquarters
- Cokemaking Facilities
- Coal Handling